Metrolink


COMPANY OVERVIEW

About Metrolink

Contact

More Info on Metrolink

Products and Press Releases

Metrolink
The new technology works to reduce traffic congestion on Juniper Avenue between Orange Way and Ceres Avenue, while improving safety for drivers and pedestrians along the corridor.
April 17, 2025
The new technology works to reduce traffic congestion on Juniper Avenue between Orange Way and Ceres Avenue, while improving safety for drivers and pedestrians along the corridor...
Alstom
Alstom has provided maintenance for Metrolink for the past 26 years.
Dec. 10, 2024
Alstom has been serving as the maintenance provider for Metrolink’s fleet since 1998.
LADOT
LADOT completes final phase of San Fernando Bike Path construction.
The completion of the three-phase San Fernando Bike Path provides a continuous, nearly 10-mile North-South bike connection in the East San Fernando Valley.
Metrolink
Kevin Gray.
Sept. 5, 2024
Gray will drive digital modernization, process optimization and strategic collaboration while managing the day-to-day activities of the agency’s integrated digital and technology...
The Southern California Regional Rail Authority
June 25, 2024
Passengers transferring between Metrolink’s San Bernardino Line and the ONT Connect shuttle service will now have a more seamless experience with this new direct and free shuttle...
Metrolink
June 7, 2024
Kettle joined Metrolink in September 2021 with more than two decades of public transportation experience in southern California and has guided the agency through the COVID-19 ...
Metrolink
June 4, 2024
The technology, which went live at the crossing on June 1 and is funded by a CRISI grant, creates a better experience for drivers and pedestrians while increasing safety for Metrolink...
Metrolink
April 11, 2024
The agency was awarded a $1.3 million SMART Stage 1 grant from USDOT, as well as an additional $1 million in congressionally directed spending from Rep. Brad Sherman for the project...
OCTA
Regular passenger service on the rail line resumed March 25 following a near two-month suspension of passenger rail traffic due to soil and debris sliding into the rail right ...
OCTA
Service had been suspended since late January due to a landslide from a privately-owned hillside that littered the rail right of way below with soil and debris.

Articles & News

Brandon Lewis
 Hilary Konczal (left) and Becca Nagorsky (right).
Feb. 7, 2025
Personnel updates throughout the public transit industry.
Metro Transit
A rider tapping her card on a Metro Transit bus in Minneapolis.
Nov. 15, 2024
All four transit agencies are implementing strategies to reduce the cost of public transit across their respective regions.
Caltrain
Caltrain, L.A. Metro and Metrolink roll out rail safety initiatives for Rail Safety Month.
Sept. 6, 2024
These agencies are utilizing social media to focus on increasing attention to the importance of following safety protocols around railways.
Metrolink
1920_metrolinkvirtualbackground134
Jan. 29, 2024
OCTA and Metrolink are working to clear the tracks after debris from the hillside slope along the Mariposa Trail Bridge in San Clemente had fallen onto the right of way and rail...
LA Metro
L.A. Metro Ambassadors continued their customer service work throughout the storm.
Aug. 21, 2023
The storm made landfall in Mexico before moving north into California, bringing high winds and heavy rains into the state.
OCTA
The wall built to protect the rail line below the Casa Romantica slope.
Aug. 16, 2023
The authority selected HDR to conduct Phase 1 of a two-phase study looking at ways to protect the coastal rail line between Dana Point and San Clemente, Calif.
Amtrak Pacific Surfliner/LOSSAN Rail Corridor Agency
Amtrak Pacific Surfliner Credit Amtrak Pacific Surfliner Lossan Rail Corridor Agency
July 12, 2023
Train service has been disrupted since late April after the slope below Casa Romantica Cultural Center and Gardens in San Clemente began to slide.
City of Calgary
The government of Alberta and city of Calgary will study alignments to bring rail service to Calgary International Airport.
July 11, 2023
The Alberta government is investing in a study evaluating a rail connection to Calgary Airport while a cost sharing agreement between SBCTA and L.A. Metro supports the study expanding...
OCTA
On June 5, the slope below the Casa Romantica Cultural Center in San Clemente, Calif., moved significantly with debris, dirt and a tree entering the right of way of the rail line at the bottom of the slope.
June 15, 2023
The slope below the Casa Romantica Cultural Center experienced a significant slide in early June that has stopped passenger rail service indefinitely.
LOSSAN Corridor Rail Agency
Metrolink and Pacific Surfliner passenger trains resumed service May 27 through San Clemente following emergency slope stabilization repairs on the slope below Casa Romantica Cultural Center.
May 30, 2023
Passenger train operations had been suspended in the area north of the San Clemente Pier after slope movement occurred in late April.

Request More Information

By clicking above, I agree to Endeavor Business Media's Terms of Service and consent to receive promotional communications from Endeavor, its affiliates, and partners per its Privacy Notice. I also understand my personal information will be shared with the sponsor of this content, who may contact me about their offerings per their privacy policy. I can unsubscribe anytime.

All content from Metrolink

Metrolink
March 13, 2024
To help make its system safer for riders, Metrolink is launching specialized anti-trafficking training for its employees and an ad campaign on noticing the signs of trafficking...
OCTA
OCTA, Metrolink and LOSSAN agreed service on the Amtrak Pacific Surfliner can resume after 33 steel beams for the foundation of the containment wall at Mariposa Point were installed...
OCTA
The 200-foot-long wall, which will stabilize the slope above the rail line, will be completed in mid-March with passenger rail service anticipated to return by late March or ...
Metrolink
Feb. 23, 2024
The agency has received $59.3 million from the South Coast AQMD Governing Board to purchase the vehicles; the board also approved up to $87.4 million from South Coast AQMD’s contingency...
OCTA
The catchment wall will protect the track from soil and debris from a privately owned slope that slid into the rail right of way in late January.
OCTA
In response to a recent landslide in the OCTA service area, the agency is moving forward with plans for a barrier wall to protect tracks from sliding land in San Clemente near...
Metrolink
1920_workatunionstation
Dec. 14, 2023
The pause in service will allow Metrolink to complete infrastructure upgrades, maintenance and repairs, as the Los Angeles mega-region prepares to host high-profile international...
St. Clair County Transit District
construction__metrolink_expansion_to_midamerica_st
The project will extend the MetroLink light-rail system 5.2 miles from the existing Shiloh-Scott Transit Center in Shiloh, Mo., to MidAmerica St. Louis Airport in Mascoutah.
Metrolink
1920_mlandpsltrains
Nov. 8, 2023
The partnership will help to expand the existing codeshare program, allowing Metrolink and Amtrak Pacific Surfliner ticket holders with origin and destination stations between...