The Pie-IX Bus Rapid Transit (BRT) line will begin service on Nov. 7 as part of a gradual opening of the full line. Buses will operate between Saint-Martin in Laval and Pierre-De Coubertin Avenue in Montréal. The exceptions to this service will be in the Jean-Talon area where a pedestrian tunnel to the future Blue Line remains under construction and the Pie-IX bridge where renovations will be completed in 2023.
The 13-kilometer (eight-mile) Pie-IX BRT project is a joint effort between the Autorité régionale de transport métropolitain (ARTM), the City of Montréal, the Ministère des Transports (MTQ), the Société de transport de Montréal (STM), and their partners, the City of Laval, the Société de transport de Laval (STL), exo, the Société québécoise des infrastructures (SQI) and the boroughs served by the projects.
The line features traffic signal priority and reserved lanes to speed STM, STL and exo buses; accessible bus shelters with pedestrian safety enhancements and a new fare structure between zones. At the opening of the line, it will have 28 stops, but eventually include 38 stops.
The BRT will also offer transfers to the métro Green line (Pie-IX station), STL services in Laval and the exo5 commuter train line to Mascouche (St-Michel-Montréal-Nord station).
Mass Transit Staff Report
Stories under this byline were produced through a team effort by the editorial staff of Mass Transit.
To learn more about our team, click here.
If you have a story idea, let us know by emailing [email protected]. Please review our contributor guidelines found here.