- Rail
- Infrastructure
OCTA, Metrolink to study long-term solutions to protect San Clemente rail line
Regular passenger service on the rail line resumed March 25 following a near two-month suspension of passenger rail traffic due to soil and debris sliding into the rail right of way, the fifth suspension of service on the line in the past three years.