The Citylink trains of the Net 2012 series from Vossloh’s subsidiaries Vossloh Kiepe and Vossloh Rail Vehicles have been approved by the Federal Railway Agency on June 19, pursuant to the German Regulations Governing the Construction and Operation of Railways (EBO). Thus, the new light rail vehicles have not only been approved for operation in the city pursuant to the German Regulations on the Construction and Operation of Light Rail Transit Systems (BOStrab), but also for operation on the railway tracks of the lines S1/S11 of the “Karlsruher Verkehrsverbund” energised with 750 V.
Since May 2014 the new LRVs have been delivered and put into service step by step. Before that, the trains had been thoroughly tested in the factory of the vehicle manufacturer in Valencia and by the Verkehrsbetriebe Karlsruhe GmbH (VBK). The test evidences and documentations for urban homologation were presented to the Technical Supervisory Authority of Baden-Württemberg already in the autumn of 2014. Therefore, it was possible to present the homologation certificate with the provisional operating licence pursuant to BOStrab already on Sept. 25, 2014 at Innotrans in Berlin, which was only four months after delivery of the first vehicle to the Karlsruhe transport company. At present, the new low-floor vehicles are operated daily on the urban tramway lines in Karlsruhe. As the LRVs have now also been approved for operation on EBO lines, they can now also be operated on the regional lines S1/S11 between Hochstetten and Bad Herrenalb / Ittersbach. Thus, on these lines the NET 2012 changes from being a flexible light rail vehicle with a strong braking performance to being an up to 80 km/h fast regional train – completely unnoticed to the passengers.
The contract, which was concluded in October 2011 between the Verkehrsbetriebe Karlsruhe GmbH (VBK), the Albtal-Verkehrs-Gesellschaft (AVG) and the supplier consortium Vossloh Kiepe/Vossloh Rail Vehicles, comprises delivery of 25 vehicles and two options for another 50 vehicles. The first option for 25 vehicles has already been used. 15 NET 2012 are already in Karlsruhe, the other 35 vehicles will be delivered step by step until the summer of 2017.