The new bus station will be located right next to Manukau Train Station and will be at the heart of the new public transport network for south Auckland.
Enabling works to prepare the site for main construction works have been completed, which included installing a new stormwater management system, vertical sand drains, drainage blanket and preload through the middle of the site.
Main construction work is expected to start in later this year.